Announcement - Asse II mine 01 December 2017: Concept planning for the retrieval of the radioactive waste located on the 725 metre and 750 metre level Since May 2015, the Working Group for Retrieval  ...
Announcement – Konrad repository 29 November 2017: Information meeting “Subject: Konrad – Status of construction” The Bundesgesellschaft für Endlagerung mbH (BGE) hosted a public event at the Info  ...
Announcement – Konrad repository 28 November 2017: 700 metres of electric cables fell from the ceiling at a construction site in the Konrad mine On Monday evening, electric cables at a length of 700  ...
Announcement – Morsleben repository 24 November 2017: NBG visits emplacement areas in the Morsleben repository On the occasion of its 11th meeting on 10 and 11 November 2017, the National Support  ...
Announcement – Konrad repository 17 November 2017: Invitation to the information meeting “Subject: Konrad – Status of construction” on 28 November 2017 Since 25 April 2017, the Bundesgesellschaft für  ...
Announcement – Asse II mine 28 November 2017: Invitation to the information meeting “Subject: Asse – Status of the retrieval planning” on 5 December 2017 Since 25 April 2017, the Bundesgesellschaft  ...
Announcement - Asse II mine 23 November 2017: Values measured in the evacuated inflow waters. Roughly 12.5 cubic metres of saline influent waters are collected in the Asse II mine every day. The  ...
Announcement - Asse II mine 13 November 2017: Panel discussion “Asse II mine: Measuring the radioactivity in the surrounding area” How must surveys be designed to ensure that the health status of the  ...