Announcement – Konrad repository
08 November 2017: Exchange of supports for the lower sheave platform
The preliminary disassembly activities were performed with the help of a 200 tons crane. An even larger crane with a maximum load of 500 tons finally lifted the new supports (2.70 metres high, 11 metres long and with a weight of 10 tons) to a height of 38 metres.
The next step was to install back beams and wind bracing that will stabilise the headgear. These activities were accomplished by the end of October.
Exchange of supports in the headgear