Article 57b Para. 8. Atomic Law (AtG) provides for the publication of significant documents that relate to the Asse II shaft mine. The Bundesgesellschaft für Endlagerung mbH (BGE) has published further significant documents:
Recommendations and statement of opinion
- Requirements for the filling of SVS-750-14 and the chutes in the bottom of SB-725-4 (Date: 03.03.2017)
- Report on QSB rating of Asse-GmbH 2016 (Date: 10.02.2017)
- Report on QSB rating of Asse-GmbH 3rd Quarter 2016 (Date: 15.11.2016)
- Report on QSB rating of Asse-GmbH 2nd Quarter 2016 (Date: 01.08.2016)
- Report on QSB rating of Asse-GmbH 1st Quarter 2016 (Date: 17.05.2016)
Measurement results and analyses: Site monitoring
- Inclinometer measurements - 20th Report (Date: 10.03.2017)
- 152nd Interim Report on extensometer measurements (Date: 28.02.2017)
- Radiological monitoring of the firedamp in the Asse II shaft mine. Reporting period January - October 2016 (Date: 18.01.2017)
- Radiological monitoring of the firedamp in the Asse II shaft mine. Reporting period January - October 2016 (Date: 18.01.2017)
- Radiological monitoring of the firedamp in the Asse II shaft mine. Reporting period January - June 2016 (Date: 15.11.2016)
- Measurement result from tritium monitoring of saline solutions from the Asse II shaft mine for the year 2015. Appendix 2 of 2 to the 2015 Annual Report on radiological saline solution monitoring in the context of the operational radiation protection of the Asse II shaft mine (Date: 01.09.2016)
- Results from internal gamma spectroscopic measurements of saline solutions for the year 2015. Appendix 1 of 2 to the 2015 Annual Report on radiological saline solution monitoring in the context of the operational radiation protection of the Asse II shaft mine (Date: 26.08.2016)
- Measurement result from tritium monitoring of saline solutions from the Asse II shaft mine for the year 2014. Appendix 2 of 2 to the 2014 Annual Report on radiological saline solution monitoring in the context of the operational radiation protection of the Asse II shaft mine (Date: 25.04.2016)
- Results from internal gamma spectroscopic measurements of saline solutions for the year 2014. Appendix 1 of 2 to the 2014 Annual Report on radiological saline solution monitoring in the context of the operational radiation protection of the Asse II shaft mine (Date: 07.03.2016)
Measurement results and analyses: Environmental monitoring
- Annual Report on Emission and Immission Monitoring 2016 (Date: 03.04.2017)
- Quarterly Report on Emission and Immision Monitoring 4th Quarter 2016 (Date: 03.04.2017)
- Accompanying report on daily levelling 2016 (20.02.2017)
Studies and reports
- Experimental works on the safeguarding of model calculations and maximum concentrations for plutonium and americium (Date: 16.02.2017)